LEMBAGA HASIL DALAM NEGERI MALAYSIA (HASiL) PEJABAT HASiL TEMERLOH
Project Description
- GBI Rating
- Certificate No.
- GBI-NRNC-0394(P)
- Validity Date
- 14 Aug 2026 – 13 Aug 2029
- Building Category
- Non-Residential New Construction (NRNC)
- Location
- JALAN MERDEKA 28000 TEMERLOH, PAHANG DARUL MAKMUR, MALAYSIA., Selangor
- Local Authority
- MPTemerloh - Majlis Perbandaran Temerloh
- Owner
- PORTLAND ARENA SDN BHD
The development of LHDN Office Temerloh Branch is new building developed to replace the existing Temerloh branch office which occupies a shop lot area in Temerloh. It will be developed under the Design and Build initiative whereby the location of the newly proposed branch will be in a more conducive area located within the vicinity of government office district of Temerloh. The development components consist of Office Spaces, Multipurpose Hall and Cafe, support spaces such as Information Counter, Management Office, Surau and Toilet along with other M&E spaces of which the general arrangement shall be a shell and core design during the project implementation with furniture only limited to LHDN office area. The sustainable and green features of the development as follows; The building is oriented along the north south orientation. Overall window to wall ratio of the building is at 20% achieving an OTTV of around 31W/m2. Glass or glazing on the building façade are mostly oriented facing the east and west with horizontal shading elements. The roof design is generally of lightweight metal deck roof on which it shall be insulated to conform to the GBI mandatory requirement as well as MS1525. The building design and layout has offered a good external view for its’ occupants and has further welcomed a good natural daylight penetration in its internal spaces however, as some of the spaces may be subjected to glare therefore blind glare control is taken into consideration to be installed either during the project or for some spaces which are beyond the project scope all will be spelt out under fit-out guidelines. All lighting in the building will be installed with energy efficient luminaries, mostly fitted with LED lamps. Further energy optimization is achieved with installation of motion sensors and proper lighting zones. To monitor the energy and water consumption, BMS system shall be installed along with the EMS programming. Most of the common spaces will be naturally ventilated with only air-conditioning limited to working office and multipurpose hall area. The office will be installed VRV system together with CO2 monitoring while the hall will be utilizing an air cool package system which will be installed during the project while the Cafe space will be carry-out during fit out. Cafe’ operator intended to have a/c units during fit out will be subjected fit-out guidelines to comply with fresh air requirements. Apart from water efficient fittings such as faucets and flushing units which will be installed for the project, rainwater harvesting is also part of this initiative whereby the rain water harvested shall be utilized for flushing and landscape irrigation Other sustainability features include Low VOC materials as well as incorporating materials which have recycle content, carpool parking facility and designated green parking facility.
Consultants
- Visit website
Alistidama Practice Sdn BhdGBI Facilitator