Green Building IndexDirectory

EURO ATLANTIC WAREHOUSE

INC:DA

Project Description

GBI Rating
Certified
Certificate No.
GBI-INC-0032(P)
Validity Date
26 Jun 2020 – 25 Jun 2023
Building Category
Industrial New Construction (INC)
Location
LOT PT 16166 (LOT 56827), MUKIM BATU, 68000 WILAYAH PERSEKUTUAN KUALA LUMPUR, Kuala Lumpur
Local Authority
DBKL - Dewan Bandaraya Kuala Lumpur
Owner
EURO ATLANTIC SDN BHD

EURO ATLANTIC WAREHOUSE, AMPANG KL Euro Atlantic Warehouse is which a 5-storey building which operates to package and store fresh produce to be distributed to supermarkets and grocery stores. Majority of the building consists of cold rooms and there is also factory area for packing and offices. • Basement – Carpark • Ground Floor – Cold rooms, loading and packing area • 1st Floor – Staff cafeteria, operation training • 2nd Floor – Cold rooms, factory area for packing • 3rd Floor – Storage, gymnasium • 4th Floor – Offices, staff cafeteria Green Features 1. Low OTTV value < 50 W/m2 and low roof u-value < 0.4 W/m2K to provide thermally comfortable environment & reduce energy consumption 2. Equipped with Energy Management Systems to monitor and control energy consumption of building 3. Generates energy from a 155kWp solar panels system installed at the roof 4. 29% Energy Use Intensity (EUI) improvement 5. Fresh air provision meeting ventilate rate requirements for good indoor air quality 6. Use of environmentally friendly and low VOC paints, adhesive, sealants and wood products with no urea formaldehyde 7. ACMV systems designed with temperature/humidity for thermal comfort and mould prevention 8. Lighting designed according to MS1525 for optimum lux levels 9. Habitable rooms with daylight provision and external view 10. Implementation of post occupancy survey to ensure satisfaction from the occupants 11. Building is constructed on appropriate site 12. Plenty of basic amenities and services in close vicinity from the building 13. Abundance of vegetation and landscape area to minimize urban heat island effect 14. Earthwork pollution control during construction 15. QLASSIC score of 70% to ensure good construction quality 16. Provision of proper site amenities for workers during construction 17. Provision of green vehicle & carpol priority parking and does not exceed required parking capacity 18. The storm water and drainage design complies to MASMA requirement 19. Hardscape and roof material with SRI > 78 to reduce heat island effect 20. Provision of a cohesive building user manual for occupants and maintenance team to understand and implement green features of the building 21. Use of recycled content material and regional materials during construction 22. Recycling facilities to collect recyclables during construction and occupancy 23. Use of zero ODP refrigerants for ACMV systems and clean agents for fire suppression system 24. Rainwater harvesting system for landscape irrigation and water efficient fittings to reduce potable water consumption 25. Installation of water meters to monitor consumption and leak detection 26. Herbs garden incorporated in landscape for occupants’ use 27. Real time public display of energy monitoring for green awareness 28. Low concrete usage index < 0.45 indicating efficient use of concrete 29. Green Building Facilitator to advise on green features throughout design and construction stage

Consultants