Green Building IndexDirectory

EQUALBASE VALDOR II

INC:DA

Project Description

GBI Rating
Gold
Certificate No.
GBI-INC-0062(P)
Validity Date
31 Jul 2025 – 30 Jul 2028
Building Category
Industrial New Construction (INC)
Location
LOT 1003, JALAN PERINDUSTRIAN VALDOR 1, KAWASAN PERINDUSTRIAN VALDOR, MUKIM 12, DAERAH SEBERANG PERAI SELATAN, 14110 BATU KAWAN, PULAU PINANG, MALAYSIA, Penang
Local Authority
MBSP - Majlis Bandaraya Seberang Perai
Owner
EQUALBASE VALDOR II SDN BHD

Equalbase Valdor 2, Penang is a new constructed development project by EQUALBASE DEVELOPMENT SDN BHD. and it is a 2-storeys of Industrial Building that located at LOT 1003, JALAN PERINDUSTRIAN VALSOR 1, KAWASAN PERINDUSTRIAN VALDOR 1, KAWASAN PERINDUSTRIAN VALDOR, MUKIM DAERAH SEBERANG PERAI SELATAN, PULAU PINANG. The total floor areas is 71,662.73 sqm. For Energy Efficiency Part, all individual rooms or enclosed spaces are individually switched and each individually switched zone shall not exceed 100m2 for 90% of the NLA. Motion sensor control lighting will be installed for at least 25% of common areas. Sub-meters will be provided for energy use > 100kVa, separating lighting and power sub-meters. Huge size of solar panel (1800kWp) will help to generate at least 2.5% of the overall building energy. Due to the huge solar panel size, the EUI for the project is more than 55% (59.9%). This project also appointed Ir. Tan Khim Bok which is the Commissioning Specialist, CxS (GBICxS/C0017) to enhance the commissioning for the energy related system for the project. 50% of building maintenance team to be on board 1 to 3 months before practical completion, to be involved in testing and commissioning of all building energy services. Designated building maintenance office with sufficient storage for inventory of tools and instruments are provided. For Indoor Environment Quality, building is provided with a designated external smoking area 10m away from the main building area. At least 50% (59.90%) of the NLA allow the building occupant to harvest sufficient daylight with daylight factor 1-3.5%. Horizontal blind will be installed at all the glazed area to prevent glare and to keep workspace lux level below 2000. Besides, lighting design in the building designed by the M&E to comply not more than MS 1525 for 90% of NLA. All lighting fittings are LED which is high frequency ballast to avoid low frequency flicker. In the Sustainable Site Planning & Management criteria, this industrial project is developed within the industrial zone. Parking provided does not exceed the local council requirement and 5% of the total provided parking space (242 parking bays) are carpool/vanpool parking (13 parking bays) to encourage the building occupants to carpool or vanpool. Also 5% of the total provided parking space (242 parking bays) will indicate as green vehicle priority parking (13 parking bays). For Material & Resources MR criteria, at least 30% (30.50%) of the building material (Steelwork & AAC Wall) consists of recycle content based on the costing. Main building materials will be sourced within 500km of the site location and minimum consists 20% (68.06%) of total value of the material in the project. Meanwhile, for Water Efficiency Criteria, with 50m3 of the Rainwater Harvesting System Tank will able to help the project to reduce at least 30% (44.47%) of the building potable water consumption. 3 ticks excellent water efficient fittings will be installed through the building to reduce at least 50% (60.22%) of building potable water consumption. Last but not least for Innovation criteria part, at least 1 physical EV car charging station will be installed at the site and the rest of the green vehicles parking (12 parking bays) will be provided with isolator that sufficient power for future extension. Total 51m2 of the greenscape area is planted with herb species which contribute at least 10% (17.37%) of the overall landscape area. Thus, brief of the green features install/apply for the project allow this project to achieve GBI Gold Rating (80 points).

Consultants