Green Building IndexDirectory

ECOSKY (RESIDENTIAL)

RNC:CVA

Project Description

GBI Rating
Certified
Certificate No.
GBI-RNC-0078
Validity Date
07 Jun 2021 – 06 Jun 2024
Building Category
Residential New Construction (RNC)
Location
972, BATU 6 1/2, JALAN IPOH, 68100 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR, Kuala Lumpur
Local Authority
DBKL - Dewan Bandaraya Kuala Lumpur
Owner
ECO SKY DEVELOPMENT SDN. BHD.

EcoSky Residential is a residential development which is a part of the larger EcoSky master development consisting of 3 residential towers amounting to a total of 975 residential units; Aurora (Block A) has 32 residential floors, Basalta (Block B) has 32 residential floors and Clarita (Block C) has 35 residential floors with 6 carpark floors and a double volume facilities floor located at the podium.It has a total gross floor area of 120,283.89 m2 excluding carpark, located near Taman Wahyu, along Jalan Kuching. It has plenty of green features installed and implemented to ensure that it is a sustainable and energy & water efficient building. The features include:- 1. High speed internet connectivity infrastructure for all units 2. Management implements sustainable maintenance practices 3. All unit types meets minimum ventilation rate of UBBL and all public and circulation spaces have natural ventilation 4. Environmentally friendly low VOC and no formaldehyde wood products were used during the construction of the residences 5. All units have low sound penetration value which is below recommended level 6. Implementation of post occupancy survey to ensure satisfaction from the occupants 7. Building is constructed on an appropriate site, in accordance to DBKL’s Structural Plan and not within any wetlands, forest reserves and prime agricultural land 8. Building located near Komuter station with direct and sheltered pedestrian access from the residences to the station 9. Plenty of basic services in close vicinity from the sitesuch as F&B outlets, banks, clinics and place of worship 10. Abundance of greenscape and pool areato minimize urban heat island effect 11. Implementation of proper site amenities plan and IBS system during construction of the building 12. The drainage system adheres to the MASMA requirement 13. Building User Manual is provided for access of all occupants so that the green features of the building is highlighted 14. Comprehensive collection of recycled waste during construction 15. Usage of recycled content materialand regional material during construction 16. Landscape irrigation uses water collected from Rainwater Harvesting System 17. Water efficient fittings installed for the units and common area toilets 18. Abundant selection of herbs for the landscape 19. Concrete Usage Index of less than 0.5 m3/m2 20. Installation of Regenerative Lifts for 100% of the lifts 21. Involvement of GBIF from the initial design stage up until the post occupancy stage