CONLAY STATION (PHASE 1 - TOWER A 41 STOREY)
Project Description
- GBI Rating
- Certificate No.
- GBI-NRNC-0222(P)
- Validity Date
- 13 Apr 2018 – 12 Apr 2021
- Building Category
- Non-Residential New Construction (NRNC)
- Location
- LOT 301, SEKSYEN 63, JALAN CONLAY 50450, KUALA LUMPUR, Kuala Lumpur
- Local Authority
- DBKL - Dewan Bandaraya Kuala Lumpur
- Owner
- CONLAY 301 SDN BHD
The Conlay Station (Phase 1 - Tower A 41 Storey) is planned within the vicinity of KLCC in Kuala Lumpur. The development comprises of a 41 storeys office tower. The development was designed to achieve Green Building Index (GBI) Gold rating and meet the goals of energy and water efficiency. The major green features of the building include the use of low VOC paint and coating for all interior walls and ceilings, reduction of pollution to the surrounding by complying to the Manual Saliran Mesra Alam (MSMA) requirements, provision of sub meter to monitor building energy and water consumption, use of recycled content materials and regional materials, encouragement of waste management by providing recycling bins during construction and building occupancy, automated lighting control through the use of motion sensor and photocell sensor to reduce lighting energy consumption, use of rainwater harvesting system and water efficient fittings to reduce potable water consumption, provision of carbon dioxide sensors for better indoor air quality control and energy efficient, recovery and use of condensate water from air conditioning system to reduce potable water consumption, use of regenerative lift and heat recovery wheel to reduce building energy consumption.
Consultants
- Visit websiteDME Solutions Sdn Bhd
GBI Facilitator
- Visit website
Cofreth (M) Sdn BhdGBI Commissioning Specialist
- Aki Praktis
Architect
- SNA Consults Sdn Bhd
Civil & Structural Engineer
- Jurutera Perunding Kuasa Tenaga Sdn Bhd
Mechanical & Electrical Engineer
- Basar & Harun Sdn Bhd
Quantity Surveyor
- Visit websitePentago Landscape Sdn Bhd
Landscape Architect
