BANDAR GAMUDA GARDENS
Project Description
- GBI Rating
- Certificate No.
- GBI-T-0002(F)
- Validity Date
- 26 May 2016 – 25 May 2021
- Building Category
- TOWNSHIP (T)
- Location
- LOT-LOT 3804, LOT 35190 (3805), LOT 3806, LOT 3807, LOT 35193 (3808), LOT 35192 (3812), LOT 35191 (3813), LOT 35182 (3814), LOT 35183 (3815), LOT 3817, LOT 35188 (3818), LOT 35189 (3822), LOT 3823, LOT 3825 - LOT 3829, LOT 35180 (3831), LOT 35181 (3832), LOT 35179 (3833), LOT 3836 - LOT 3838, LOT 4158 - LOT 4180, LOT 4182 - LOT 4192, LOT 4195, LOT 4196, LOT 4284 - LOT 4288, LOT 4494 - LOT 4513, LOT 4515 - LOT 4556, LOT 4739, LOT 4822 - LOT 4825, LOT 26367 - LOT 26370, LOT 84171 - LOT 84174, LOT 84184 - LOT 84186, LOT 84298, LOT 84299, LOT 84306, LOT 84311, LOT 84500, 48050 MUKIM OF RAWANG, DISTRICT OF GOMBAK, SELANGOR DARUL EHSAN., Selangor
- Local Authority
- MPS - Majlis Perbandaran Selayang
- Owner
- BANDAR SERAI DEVELOPMENT SDN BHD
Township Description : predominantly residential development with some commercial elements centred around a holistic water sensitive landscape that binds all the different spaces and amenities within the project site Total Development Area : 233.25 hectares GBI Certification Awarded : GBI Provisional Silver (Final Planning Assessment) Date Awarded : 26 May 2016 Project Team Owner : Bandar Serai Development Sdn Bhd Town Planner : AJC Planning Consultants Sdn Bhd Civil + Structural Engineers : TYL Perunding Sdn Bhd Mechanical + Electrical Engineers : Perunding Eagles Engineers Sdn Bhd Design Landscape Architect : Ramboll Studio Dreiseitl Pte Ltd Submitting Landscape Architect : Medang Teja Landscaping Sdn Bhd Geotechnical Engineer : GCU Consultants Sdn Bhd EIA Consultant and Ecologist : Europasia Engineering Services Sdn Bhd Traffic Engineer : Perunding Maju Teknik Sdn Bhd Land Surveyor : Jurukur Nik Hisham & Tung Sdn Bhd GBI Facilitator : Fenestra Malaysia Sdn Bhd Green Strategies 1. Biodiversity conservation Biodiversity mitigation measures in line with the biodiversity action plan to restore and enhance the local environment and its ecology. Steps include re-establishment and diversification of flora as well as conservation and creation of wildlife habitat Extensive provision of green spaces covering 30% of site area in the form of parks, playgrounds, lakes and community food gardens; trees shading > 60% of hardscape area and > 40% of green space; lakes, rain gardens, wetlands and swales covering 11% of open space Water sensitive urban design principles adopted where stormwater is managed in the landscape design Soil bioengineering implemented to stabilise lake banks using vegetative materials Native water cleansing plants installed to purify and filter stormwater run-off Light pollution prevented by fully shielded lamps for street and park lighting 2. Community Planning & Design Green awareness – site wide identification signages for trees and crops in community food gardens; provision of bird feeders; educational signages on green features built into the township Accessible lake edge design allows close contact with water due to its seasonal flexibility in responding to changing water levels Universal design at all public areas allows accessibility to both people with and without disabilities Masterplan designed with CPTED (Crime Prevention Through Environmental Design) principles to enhance safety 3. Water Conservation Lakes, raingardens and wetlands serving as storm-water retention bodies also provide all water used for landscape irrigation as well as for construction activities. Weirs across lakes ensure that there is water available at all times 4. Resource conservation Community based recycling actively encouraged with management organised campaigns Shaded dedicated pedestrian and cycling networks provide site linkages to reduce travel by car. Facilities include bicycle parking at communal hubs and closely spaced pavilions providing shelter and rest-stops Use of low impact regional and recycled content building materials for the public buildings and structure Excavated rocks used as sculptures in parks and as lake weirs Compost from landscape waste provides organic fertiliser
Consultants
- Visit websiteTYL Perunding Sdn Bhd
Civil & Structural Engineer
- Perunding Eagles Engineers Sdn Bhd
Mechanical & Electrical Engineer
- Atelier Dreisietl
Landscape Architect
- AJC Planning Consultants
Townplanner
